Skip to content
Sean Marroquin
Esc
  • HomePage
  • WorkPage
  • AboutPage
  • Start a projectPage
  • How this site is builtPage
  • BlogPage
  • DownloadsPage
  • Client PortalClients
  • PhysicalCount for Limitless POSCase study
  • The Listening RoomCase study
  • CelebrationsCase study
  • Teen Arts AmbassadorsCase study
  • TerraLoopCase study
  • The HollowCase study
  • ListoCase study
  • PasslineCase study
  • DeadBoltCase study
  • DesklingCase study
  • AccuBetsCase study
  • UnwrittenCase study
  • Getting found locally: what actually matters for a small businessPost
  • Getting your point of sale to talk to everything elsePost
  • How to do a physical inventory count without closing the storePost
  • What does custom software cost? What actually drives the pricePost
  • Custom software or off-the-shelf? How to tell which your business needsPost
  • How this site is builtPost
  • Why every client gets a portalPost
  • Switch between light and darkAction
  • Copy my email addressAction
  • PWNTT ArcadePlay
  • Play The Deploy TrailPlay
  • Play Merge ConflictPlay
  • Play Code ReviewPlay
  • Play BacklogPlay
  • Play Standup SurvivorPlay
  • Play Scope CreepPlay

Use the arrow keys to move and Enter to open.

All posts

What does custom software cost? What actually drives the price

3 min read

"How much will it cost?" is the first question almost everyone asks, and "it depends" is the least useful answer. It does depend, though, so here is what it depends on, and how to keep the number where you want it.

Why there is no price list

The range is wide. A fix, a report, a form, or a small automation that saves someone an hour a day can cost a few hundred dollars. A mobile app with a server behind it, payments, and several kinds of user can cost many times that. Most work falls somewhere in between, and where it lands comes down to a handful of decisions.

That is why every project I take on gets a written scope and a fixed quote before any work starts. You see the number first, and nothing is built until you approve it.

What makes a project cost more

The number of different people who use it. An app for your staff is one design. Add customers, then managers who see everything, then a partner who sees part of it, and each one needs its own screens, permissions, and testing.

Systems with no way in. Some software has a clean, documented connection for other programs. Some keeps its data in a local database with no documentation at all. The second kind is still possible (much of my background is exactly that), but it takes longer to do safely.

Money and private data. Payments, refunds, and personal information need more care, more testing, and more thought about what happens when something fails halfway.

"While we are at it." Every feature on its own sounds small. Ten of them together are a second project.

What makes it cost less

Starting with the one job that hurts most. The first version of a good tool does one thing well. You use it for a month, and then you know what the second version should do. Usually it is less than you first thought.

Keeping what already works. Replacing your point of sale is expensive and risky. Connecting to it is usually not. The cheapest software is the software you already own.

Clear answers, quickly. A project moves fastest when someone on your side can answer questions within a day or two. Waiting costs time, and time is most of the price.

How to keep it inside your budget

  1. Tell the developer your budget. It is not a negotiating mistake. It lets them suggest the version that fits, instead of quoting the version that does everything.
  2. Ask for a fixed price for a fixed scope. If the work is billed by the hour with no ceiling, the risk is all yours.
  3. Ask what is not included. Hosting, app store accounts, training, and changes after launch are the usual surprises.
  4. Ask to see something working early. Feedback in week two is cheap. Feedback after launch is a change request.

The short version

The biggest driver of cost is how much the software has to do on day one. Start small, connect instead of replacing, and get a fixed quote.

If you want a real number for your project, tell me what you need. The quote is free, and you will have it before any work starts.

Want the next one? Subscribe by RSS.